Camper trailer loses equipment at the 11foot8+8 bridge

The last 4 months were quiet at the canopener bridge – presumably due to construction and frequent road closures on Gregson St. right at the bridge and on the stretch south of the tracks. However yesterday, on April 26 – a camper trailer had some of its rooftop equipment removed at the canopener bridge. This was recorded as crash # 175 since April 2008.

Leave a Comment

YouTube
YouTube
RSS
Follow by Email